
| Location: | Ningbo |
| Stystem Type: | roof-top power |
| Installed Capacity: | 5MW |
| Material: | galvanized steel |
| Installation Solution | Cement Block |
| Module | Fullstar |
| Module Power | 250W |
| installation Time | 2014.4-2014.6 |

| Location: | Ningbo |
| Stystem Type: | roof-top power |
| Installed Capacity: | 5MW |
| Material: | galvanized steel |
| Installation Solution | Cement Block |
| Module | Fullstar |
| Module Power | 250W |
| installation Time | 2014.4-2014.6 |